It happens all the time. You describe a job twice, in the same words, and get two answers that are nowhere near each other. The instinct is to assume somebody is chancing it. Occasionally that is true. Far more often, the two firms are pricing two different jobs.
There are three things it normally turns out to be.
One of them has understood the access differently
This is the big one. If you describe a lift over a garden fence and one firm pictures a wide road with a driveway to park across while the other pictures a narrow street with cars both sides, they are pricing different days. One is a straightforward set up and one might need a longer reach, a different standing position, or a road closure.
The same goes for the ground, whether there is anything overhead, and what has to happen at the far end. None of that is hidden. It just means one of them asked more questions than the other, or was given more to go on.
If you want the prices to be comparable, give both firms the same information, and give them photographs. The same three pictures to both, and the differences usually shrink to something you can actually judge.
One has included the lift and the other has not
Worth reading carefully. There is a real difference between moving an item and placing it. A haulage price can mean the thing arrives at your gate on a lorry and comes off on the ground somewhere near it. A HIAB price means it is picked up, carried and set down where it has to go.
Check what happens at each end, too. Is the collection from a supplier's yard priced in. Is waiting time priced in if the supplier is slow. Is a second visit included if the ground is not ready when we arrive. Is somebody banking the load. Those are the lines that make two apparently similar prices behave very differently on the day.
One is sending more vehicle than the job needs
A bigger vehicle than the work requires costs more to run and it does not make the lift any better. Sometimes the bigger one is genuinely the right answer, because of the distance from the standing position or the far end of the job. Sometimes it is just what happened to be free.
The question worth asking is a simple one: why that vehicle for this job. A straight answer to that tells you a lot.
Whichever way the prices fall, these are the things worth putting side by side before you decide anything.
- What exactly is included at both ends, collection as well as delivery.
- Whether the price covers placing the item or only delivering it.
- What happens, and what it costs you, if the job overruns or the site is not ready.
- Whether they have seen the same photographs you sent everybody else.
- Whether anybody has told you what could go wrong and how they would handle it.
The cheapest quote is often the one from the firm that understood the job least, and the gap turns up later as an extra visit. Our HIAB hire cost page sets out what genuinely moves a price on this kind of work.
If you have got two quotes in front of you and they do not make sense, email us at info@manchesterhiabshire.co.uk and we will talk it through.
Need a lorry? Ask for a quote or email us and tell us what needs moving.